? ??????????????????? ????Easy Install Instructions:???1. Copy the Code??2. Log in to your Blogger account
and go to "Manage Layout" from the Blogger Dashboard??3. Click on the "Edit HTML" tab.??4. Delete the code already in the "Edit Template" box and paste the new code in.??5. Click "S BLOGGER TEMPLATES AND TWITTER BACKGROUNDS ?

Friday, September 4, 2009

PUTRA-LRT..one of the transportation system


The LRT System 2 known as PUTRA LRT, covers a total distance of 29 km linking the eastern and western suburbs of Kuala Lumpur servicing some of Kuala Lumpur's most affluent and heavily populated areas.
It is using the Advanced Rapid Transit Mark II technology which has been successfully tested and proven in North America and Europe with a very high performance specification specially designed to meet the needs of Kuala Lumpur.
The total alignment which starts from the Depot in Lembah Subang and ends at Terminal PUTRA in Gombak is 29km in length. The construction was divided into two (2) sections: Section 1, which is from Lembah Subang Depot to Pasar Seni Station and Section 2, which is from Pasar Seni Station to Terminal PUTRA.
Featuring the state-of-the-art transport system, The PUTRA LRT operates with 35 two-car units traveling at an average of 40 km per hour. Its initial capacity of 10,000 passengers per hour per direction is expected to increase to 30,000 in the near future. All trains are fully air-conditioned and provide a service level of 90 seconds during peak hours and between 3 minutes (3) to ten (10) minutes during off-peak hours. The service is provided from 6.00 a.m until 12.00 midnight, on Monday - Saturday, and 8.00 a.m. to 11.00 p.m. on Sunday and Public Holidays.
For the convenience of commuters, PUTRA LRT provides dedicated feeder bus service within 3-km radius from each station. Bus schedules are posted at major bus stops. The operational hours coincides with the LRT operation hours.
Currently, PUTRA LRT is the world's longest, fully automatic LRT.

0 comments: